1. Machine Brief
This machine has separated empty capsule feeding station, powder feeding station and capsule closing station. The medium processes need to be operated by manual. The machine use three inverters to control the speed of capsule feeding turret, powder feeding turret and the powder feeding auger. All the operation is very easy and simple, can be filled the powder & granule material easily.
2. Machine Features:
The machine body and working table adopt stainless steel, and increased one assistant big feeding hopper, it's easy to connect to the vacuum feeder. The machine conforms to the sanitary requirement of pharmaceutical & nutrition industries. It's widely used for filling the powder & granule material in pharmaceutical & nutrition industries.
3. Technical parameters
Mould changing time |
5-8mins |
Working capacity |
20000-25000 pcs/hour |
Suitable capsule size |
000#,00L#,00#,0L#,0#, 1#,2#, 3#,4# ,5# |
Power supply |
380V 50Hz 3PH 4.0kw |
Compressed air |
0.03m3/min 0.7Mpa |
Vacuum pump |
40m3/h |
Overall dimension |
1140×700×1600 mm |
Overall dimension of package(LxWxH) |
1400×860×1500 mm |
Net weight |
480kg |
Gross weight |
580kg |
4. Machine picture
5. Sample
Company profile:
Wenzhou Trustar Machinery Technology Co., Ltd established in 2006, is a specialized supplier of packaging machinery, such as pharmaceutical machinery, food and beverage packaging machinery, printing and packaging machinery, as well as plastic machinery.
As one of the first professional suppliers in pharmaceutical machinery field, we select master pharmaceutical and packaging machines for you, and provide professional follow-up service. We are very keen to the world packaging machinery trend, and strictly implement machinery quality control. We can understand your requirements clearly, and make machines precisely as per your specifications.
FAQ:
Q1:Are you manufacturer or trading company?
A1: We are manufacturer with own factory and exporting department.
Q2: What's the lead time of your machine?
A2: Normally it's about 30~45 working days.
Q3: What's the payment terms?
A3: 30% deposit TT, 70% paid before shipment; or L/C, Western Union.
Q4: Can we check machine before order?
A4: Yes, welcome to visit our factory and check machine anytime.
Q5: Is it difficult to install the machine ?
Q5: For standard small machines, the machines will be packed with no take apart, it comes to you to be a complete machine; you
just need to connect power and compressed air to machine, then begin to operate the machine.
For large size machines, we will take the machine apart, on condition that we do our best to keep the machine easy to assembly.
You will get videos and instructions about installation of machine from us.
Q6: Does the machine power voltage meet buyers' factory power source?
A6: We can do it as your request.